Large Scale Dredging Projects
Click Here for Printable Version
Large scale dredging operations, where flow rates can exceed 20,000 GPM, require specific treatment systems. Here is a list of important things to remember when handling these situations:
- It is crucial that the bulk sediment is settled out before treatment; leaving only turbid water, not mud.
- Adequate mixing is imperative. Flocculation begins when water moves over and around the Floc Logs.
- Provide a settling pond collects the flocculated particulate that settles out of the water leaving clean water for discharge.
- A particle collection system is very useful for catching the fine floating particulate that might not have settled in the settling pond.

Mixing Chamber with Floc Logs Detail


Particle Collection System in Settling Pond


Particle Collection System Details





 |
|